Digital park

Backuping of mains system of data center Digital park in Bratislava

 

Open genset, with retention bath, MP 1300 M with power of 1300 kVA. Genset is mounted on base frame without fuel tank, which is situated in the same room. Genset is equipped by control panel MP parallel which ensures parallel operation with mains. Filling of fuel into daily tank is provided by AFD. Fuel system contains 600 l daily tank and five 1000 l storage tanks connected to each other.